Location
Dublin
Status
Planned
Type
Wastewater

Benefits

  • Increased capacity which will facilitate future development
  • Protection of the environment by reducing overflows to the Sluice River

Steps

  • Build a new pumping station at Portmarnock Bridge which can pump over twice as much wastewater as the existing station
  • Decommission the existing pumping station
  • Build storm storage to reduce the risk of emergency overflow during storms
  • Build 1.7km of new rising mains and connection to a larger sewer

View more projects

Back to the top