What are the benefits of this project?

  • Upgrade existing infrastructure at the plant and provide new elements where defects identified.
  • Improve the performance of the wastewater treatment process.
  • Prolong the operational life of the existing plant.
  • Reduce the risk of storm water flooding.
  • Ensure compliance with Urban Wastewater Treatment Regulations 2001.

What is involved as part of this project?

  1. Construct a 60.5 m3 storm water holding tank at the plant.
  2. Install a 36m³ sludge holding tank to provide for sufficient storage on site.
  3. Works will be carried out within the footprint of the plant therefore minimising disruption to residents and businesses in the surrounding area.