Location
Donegal
Status
Completed
Investment
€7.2 million
This investment will replace the old septic tank systems with modern wastewater treatment plants

Benefits

  • Providing wastewater treatment capacity for these towns and surrounding areas for a planning horizon of twenty years including preliminary treatment, secondary treatment and phosphorous and ammonia removal
  • Compliance with current E.U. Directives relating to Wastewater Treatment of discharges from urban areas
  • Facilitated the overall current and future growth and physical development of the towns and surrounding areas 

Steps

  • Design and construction of two new wastewater treatment plants, pumping stations, detention tanks, outfall pipes and rising mains in Dungloe and Glenties, serving a population of approximately 4,000 people
  • Redesign and upgrade of existing pumping station in Dungloe
  • Building of new access roads to the new wastewater treatment facilities and pumping stations
  • Design and construction of pressure outfall pipelines and overflow pipes
  • Construction of new gravity sewerage systems in Dungloe and Glenties (including the rehabilitation of existing gravity pipelines in both towns)

View more projects

Back to the top