Location
Galway
Status
Planned
Investment
€500,000

Benefits

  • Upgrade existing infrastructure at the plant and provide new elements where defects identified
  • Improve the performance of the wastewater treatment process
  • Prolong the operational life of the existing plant
  • Reduce the risk of storm water flooding
  • Ensure compliance with Urban Wastewater Treatment Regulations 2001

Steps

  • Upgrade the inlet works at the plant
  • Install a storm water storage tanks
  • Install 2 No. pumping stations at the site to upgrade storm water management
  • Works will be carried out within the footprint of the plant therefore minimising disruption to residents and businesses in the surrounding area