Location
Laois
Status
Planned
Investment
€175,000

Benefits

  • Upgrade existing infrastructure at the plant and provide new elements where defects identified
  • Improve the performance of the wastewater treatment process
  • Prolong the operational life of the existing plant
  • Reduce the risk of storm water flooding
  • Ensure compliance with Urban Wastewater Treatment Regulations 2001

Steps

  • Construct a 60.5 m3 storm water holding tank at the plant
  • Install a 36m³ sludge holding tank to provide for sufficient storage on site
  • Works will be carried out within the footprint of the plant therefore minimising disruption to residents and businesses in the surrounding area