What are the benefits of this project?

  • Improved operation of the existing plant
  • Reduced odour levels
  • Allows for analysis of load capacity
  • Allows for sampling to inform future design
  • Enables population and commercial growth in Shannon area

What was involved in this project?

  1. Upgrading the existing wastewater treatment plant.
  2. Constructing new inlet works.
  3. Repairs to rising mains.
  4. Upgrading associated pumping stations.
  5. Conducting studies & analysis on the current flow and load of the plant to allow for future design and planning of wastewater requirements.