Project Reports
- Final Option Appraisal Report - Non Technical Summary (November 2016)
- Final Option Appraisal Report - Full Report (November 2016)
- Executive Summary
- Introduction
- Remaining Viable Options
- Preliminary Options Appraisal Report (POAR) - Public Consultation
- Interim Demand Review and Phasing of Supply
- Source Abstraction Regime
- Appraisal of Source Impact
- Economic Appraisal
- Preferred Scheme
- Community Benefit Opportunities
- Preferred Scheme - Infrastructure Sites
- Preferred Scheme - Transmission Pipeline
- Concluding Statement
- Next Step
- Schedule of Drawings
- Appendix A Interim Midlands and GDA Water Resource Plan
- Appendix B Hydrodynamic and Water Quality Modelling Report
- Appendix C Cost-Benefit Analysis of Water Supply Projects for the Eastern and Midlands Region
- Appendix D Review of Treatment Technology
- Appendix E Raw Water Abstraction
- Appendix F Water Treatment Plant
- Appendix G Break Pressure Tank
- Appendix H Termination Point Reservoir
- Appendix I Transmission Pipeline
- Appendix J Preliminary Options Appraisal - Consultation Submissions Report
- Water Supply Project E Kennedy Response Summary
- Response to the December 2016 Submission from Emma Kennedy
- Preliminary Options Appraisal Report - Non Technical Summary (November 2015)
- Vol 1 Preliminary Options Appraisal Report - Full Report (updated August 2016 to correct mapping error)
- Vol 2 Appendix A, B, C, D
- Vol 3 Appendix E
- Vol 4 Appendix F
- Vol 5 Appendix G
- Vol 6 Appendix H
- Least Constrained Corridor Mapping - Discovery series
- Water Supply Options Working Paper Non-Technical Summary (June 2015)
- Water Supply Options Working Paper (June 2015)
- Appendix A - Response to Feedback from the Project Need Report Consultation
- Appendix B - Source Yield Assessment
- Appendix C - Habitats Directive Assessment
- Appendix D - Multi Criteria Analysis Assessment
- Appendix E - Strategic Environmental Assessment (2007-2011)
- Appendix F - Strategic Environmental Assessment (2007-2011) Consultation Review
- Appendix G - Strategic Environmental Assessment (2007-2011)
- Project Need Report (February 2015)
- Appendix A - Summary of Demographic Projections
- Appendix B - (WSP) Economic Needs Report
- Appendix C - Water Demand Review
Uisce Éireann has determined that Appropriate Assessments (AA) of the 'Water and Hydrographic Sampling Programs at Lough Derg (the works)' and 'Site investigation Works at Garryhinch Bog (the works)' are not required as it has been determined on the basis of objective scientific information that the works, individually or in combination with other plans or projects, will not have a significant effect on any European site. This decision has had regard to the potential for in-combination effects from other plans and projects, including existing recreational activities on Lough Derg.
Uisce Éireann's conclusion that AA's are not required was informed by the documents linked below.
This Screening for Appropriate Assessment assesses the effects of the proposed Ground Investigation works on European Sites, comprising candidate Special Areas of Conservation (SACs) and Special Protection Areas (SPAs), in-combination with other plans and projects. This AA screening report found that there is no potential for any likely significant effects on European sites from the Ground Investigation works.
This Screening for Appropriate Assessment assesses the effects of the Meteorological Monitoring Masts on European sites. In particular the Screening assessed the potential for the Masts to result in likely significant effects, which could lead to potential adverse effects on the integrity of European sites. . This AA screening report found that there is no potential for any likely significant effects on European sites from the Ground Investigation works.