Uisce Éireann has completed works to increase water conservation measures and improve water pressure in Dublin 15.

Uisce Éireann, working in partnership with Fingal County Council, carried out water works at Deerhaven Park, Littlepace, Dublin 15. These essential infrastructural works were part of a national upgrade programme and involved the construction of a Pressure Reducing Valve (PRV) Chamber and Meter Chamber off the existing pipeline which runs through Deerhaven Park. The installation of these chambers will allow significant water conservation and savings to be made in the Dublin 15 area as well as improved water pressure for the residents. Carty Contractors Limited worked on behalf of Uisce Éireann to deliver this project.

Pressure Reducing Valves are speciality valves designed to protect water installations against excessive pressure from the water supply. They do not only regulate the pressure within installations but also reduce noise and water consumption and maintain constant flow level.

Location
Dublin 15
Status
Completed
Type
Water
An Uisce Éireann worker fixing a small pipe in the ground

What are the benefits of this project?

The works carried out as part of this project will:

  • Significantly increase water savings in Dublin 15.
  • Improve water pressure for the residents of Littlepace, Clonee.
  • Increase water conservation and energy saving in the area.
  • Reduce operational costs due to reduced energy consumption.

What was involved as part of this project?

The works included the installation of key water infrastructure in the green area of Deerhaven Park. These essential infrastructural works were part of a national upgrade programme and involved the construction of a Pressure Reducing Valve (PRV) Chamber and Meter Chamber off the existing pipeline which runs through Deerhaven Park, as well as the installation of air valves, hydrants and connections off the existing water main.

Works were also carried out to install electrical ducting from an existing ESB mini pillar, outside No. 3 The Way to the existing Kiosk in the green. These works required the ducting to be installed under the existing footpath from No. 3 The Way to the end boundary of No.1 The Way and through the park to the existing Kiosk.

The works took place on the green area of Deerhaven Park and lasted for approximately 8 weeks.

The park area is fully reinstated following the works. All chambers were made flush with the existing ground and no items protruded over the ground.