As-Built Sample Drawings
Water and Wastewater Infrastructure
The As-Built sample drawings demonstrate the minimum requirements when preparing detailed record drawings of as-constructed water and wastewater infrastructure in your developments to be submitted for review and approval prior to connection to the network/s. As-Built drawings are also required to accompany The Quality Assurance Field Inspection Requirements.
As-Built drawings shall be submitted in both .Dwg and .Pdf formats and shall be orientated to the ING (Irish National Grid) coordinate system.