Read what to do.

Multi or Mixed Use

Please let us know how far along in the planning process you are, so we know how to manage your application.

Have you started planning your development?

Great, you can now fill out the Pre-Connection Enquiry Form. In order to fill it out you will need:

  1. A location map with the site boundary outlined in red (scale 1:2500) view sample map
  2. The site layout map indicating the preferred connection point for each service (water, waste water) view sample map 1 view sample map 2

Great, you can now fill out the Pre-Connection Enquiry Form. In order to fill it out you will need:

  1. A location map with the site boundary outlined in red (scale 1:2500) view sample map
  2. The site layout map indicating the preferred connection point for each service (water, waste water) view sample map 1 view sample map 2

That’s fine, however, your proposed layout will need to be design vetted for compliance to Uisce Éireann standards before an offer can be issued to you

In order to progress this please fill out a Connection Application Form. You'll need:

  1. A location map with the site boundary outlined in red (scale 1:2500) view sample map
  2. The site layout map indicating the preferred connection point for each service (water, waste water) view sample map 1 view sample map 2
  3. Your planning permission number
  4. A letter from the Local Authority (on letterhead) confirming the final name of the development (if available).
  5. Premises and Bulk Meter Registration Schedule.
    Schedule of premises and bulk meters, associated with this application.

Alternatively, you can download the PDF connection application form and submit it by email to newconnections@water.ie and include your Premises and Bulk Meter Registration Schedule as an attachment to the email.

Great, you can now fill out the Connection Application Form. You'll need:

  1. A location map with the site boundary outlined in red (scale 1:2500) view sample map
  2. The site layout map indicating the preferred connection point for each service (water, waste water) view sample map 1 view sample map 2
  3. Your planning permission number
  4. A letter from the Local Authority (on letterhead) confirming the final name of the development (if available).
  5. Premises and Bulk Meter Registration Schedule.
    Schedule of premises and bulk meters, associated with this application.

Alternatively, you can download the PDF connection application form and submit it by email to newconnections@water.ie and include your Premises and Bulk Meter Registration Schedule as an attachment to the email.


or Download Form

Please note that this PDF form is editable and can be
completed digitally before being printed and/or emailed