Read what to do.

JKL and O’Hanrahan Avenues Back Yard Service Replacement

Uisce Éireann, in partnership with Carlow County Council, is replacing ageing back yard water mains and providing new service connections for customers on JKL and O’Hanrahan Avenues, Carlow to provide a more reliable water supply, improve water quality and reduce high levels of leakage.

In some older estates water connections, typically made of iron or lead, were installed to the rear of the property and are often referred to as backyard service connections. The pipework due to age and deteriorating condition are a significant source of leakage and reduced levels of service. Backyard services are usually shared, running through a number of neighbouring properties making it difficult to detect and repair leaks. Since all properties share a connection, leaks and bursts affect all properties usually resulting in low pressure.

The works JKL and O’Hanrahan Avenues involve construction of approximately 600 meters of new water mains constructed along the public road. Approximately 70 connections will be made from customers properties to these newly constructed water mains. Approximately 70 further connections will be made to recently completed water mains.

These works will be carried out by Shareridge Ltd. in partnership with Carlow County Council on behalf of Uisce Éireann.

Location
Carlow
Status
In Progress
Type
Water

What are the benefits of the works?

The benefits of the backyard service works include:

  • Reliable Water Supply – Replacing the old water mains with new water mains and service connections will reduce the instances of bursts and water outages and will ensure a reliable supply of water to customers in the area
  • Reduced Leaks – Replacement of old water mains and service connections in poor condition will eliminate existing leaks and reduce the amount of clean drinking water lost into the ground.
  • Improved Water Quality – Removing existing old cast iron and lead from the water network and replacing them with new modern pipes will reduce the risk of contamination.
  • Improved Operation and Maintenance – These works will deliver efficiencies including cost savings by providing improved water network operation that will require less maintenance in the future.

Will customers be affected by the works?

A survey is required at each property within this community. The individual survey is undertaken to assess the current water connection arrangement for that property and discuss the best way to connect the new service to the customers home.

Customers to benefit from these improvement works will be contacted directly by Shareridge Ltd to provide information about the required works and to discuss a suitable time to carry out an individual survey.

The works, when they commence, may involve some short-term water outages and the project team will ensure that customers are given a minimum of 48-hours notice prior to any planned water outages. Where water mains are being constructed traffic management may be in place during this time. Local and emergency traffic will be maintained at all times.