Location
Clare
Status
Completed
Investment
€3.1 million

Benfits

  • Improved operation of the existing plant
  • Reduced odour levels
  • Allows for analysis of load capacity
  • Allows for sampling to inform future design
  • Enables population and commercial growth in Shannon area

Steps

  • Upgrading the existing wastewater treatment plant
  • Constructing new inlet works
  • Repairs to rising mains
  • Upgrading associated pumping stations
  • Conducting studies & analysis on the current flow and load of the plant to allow for future design and planning of wastewater requirements

View more projects

Back to the top