What are the benefits of this project?

  • Improved drinking water quality
  • Increased storage allowing current and future water demand to be met
  • Removal from the EPA’s Remedial Action List

What is involved as part of this project?

  1. The construction a pumping station at Carrickmore reservoir
  2. Laying 4.7km of rising mains and inter-connecting water mains to extend the Boyle Water Supply Scheme to Grangemore
  3. The decommissioning of the existing Cavetown WTP
  4. This project is scheduled for completion in spring 2020
Back to the top