What are the benefits of this project?

  • Upgrade existing infrastructure at the plants and provide new elements where defects identified
  • Improve the performance of the wastewater treatment process
  • Prolong the operational life of the existing plants
  • Reduce the risk of storm water flooding
  • Ensure compliance with Urban Wastewater Treatment Regulations 2001

What is involved as part of this project?

  1. Install new inlet works (screen and grit removal system), storm tank and sludge management system at the Borris Plant
  2. Install Sludge Drying Reed Bed pilot and upgrade the grit removal system at the Rathoe plant
  3. The majority of the works will be carried out within the footprint of the plants, therefore minimising disruption to residents and businesses in the surrounding area