Location
Kerry
Status
Planned
Investment
€150,000

Benefits

  • Upgrade existing infrastructure at the plant and provide new elements where defects identified
  • Improve the performance of the wastewater treatment process
  • Prolong the operational life of the existing plant
  • Reduce the risk of storm water flooding
  • Ensure compliance with Urban Wastewater Treatment Regulations 2001

Steps

  • Upgrade the inlet works at the plants, which includes the provision of inlet screens, grit removal and flow control, where applicable
  • Construct storm water holding tanks for the plants
  • Upgrade the sludge storage, thickening and dewatering facilities where required
  • Works will be carried out within the footprint of the plants therefore minimising disruption to residents and businesses in the surrounding area
Back to the top