Location
Cork
Status
Planned
Type
Water

What is involved as part of this project?

As part of this project, Irish Water will:

  • Replace and upsize where required 2.4km of various sized large diameter trunk mains between Camden Quay and Shanakiel Reservoir.

What are the benefits of this project?

  • Provide a secure and reliable water supply to Cork City.
  • Reduced leaks as the replacement of water mains and service connections will eliminate existing leaks and reduce the amount of clean drinking water lost into the ground.

View more projects

Back to the top