Location
Roscommon
Status
Completed
Type
Water

Benefits

  • Improved drinking water quality
  • Increased storage allowing current and future water demand to be met
  • Removal from the EPA’s Remedial Action List

Steps

  • The construction a pumping station at Carrickmore reservoir
  • Laying 4.7km of rising mains and inter-connecting water mains to extend the Boyle Water Supply Scheme to Grangemore
  • The decommissioning of the existing Cavetown WTP
  • This project is scheduled for completion in spring 2020